Independent guides to the U.S. national parks
Wooden gate blocking a forest road beside a rocky stream, with cabins among the trees and misty mountains beyond

Park news · Great Smoky Mountains

Roaring Fork Motor Nature Trail Closes One Day for Maintenance in Late September

The Roaring Fork loop closes September 24 from 7 a.m. to 4 p.m. for mowing and maintenance work. Here's what to know.

By David Sanchez,

If you're planning a visit to Great Smoky Mountains at the end of the month, pencil this into your itinerary. Park officials have announced a temporary closure of the Roaring Fork Motor Nature Trail, the small scenic loop that starts just outside Gatlinburg.

The road will be off-limits to visitors on September 24, from 7 a.m. to 4 p.m. Crews are using that window to mow the roadsides and safely handle other maintenance work. Traffic gets back to normal by the end of the day, so it's a single-day closure, not a long shutdown.

An orange mower cuts grass beside a winding road, with a rocky stream, flowering shrubs, forest, and mountains beyond

In practical terms, if your visit falls on that day, it's best to shift this stretch to the day before or the day after. The loop is narrow and one-way along its main section, which is why it can't stay open while equipment is working along the road. The rest of the park isn't affected. The main routes and other areas stay open.

To put this road in context, it winds through dense forest, streams, and old pioneer cabins over a few miles. It's one of the most popular scenic drives in the park, precisely because you take it slow. So a one-day closure is a minor footnote over the course of a trip, as long as you've planned around it.

Our advice is simple. Keep some flexibility in your schedule and check road conditions the morning of, since this kind of work can run long depending on the weather. To plan the rest of your visit around it, lean on the Great Smoky Mountains park guide, which breaks down the other scenic drives and the areas worth prioritizing that day.

Just a day to work around, nothing more. The loop will be waiting for you the very next morning.